000 01798nam a22003137a 4500
003 CY-NiWDL
005 20221115065059.0
006 a|||||r|||| 00| 0
008 220324s1968 cy b ||| ||||l00| 0 eng d
040 _aCY-NiWDL
_cCY-NiWDL
041 0 _aeng
082 7 _a628.83095693
_223
084 _aMDP-D-M-DES8
110 2 _4csp
_9164133
_aEnergoprojekt Engineering & Consulting
240 _aMavrokolymbos Dam Project = Έργο Φράγματος Μαυροκόλυμπου
245 1 4 _aThe reexamination of remedial works in zone No 1 /
_cEnergoprojekt Engineering and Consulting.
246 _aMavrokolymbos Dam = Φράγμα Μαυροκόλυμπου
260 _aNicosia :
_bDepartment of Water Development,
_c1968.
300 _a 5 p. :
_b5 maps, drawings ;
_c30 cm.
500 _aAlso available in digital form.
500 _a5 maps are included. Map 1. Mavrokolymbos reservoir ground contures of zone No 1 -- map 2. Western area of zone 1 plan -- map 3. Critical sections of zone 1 -- map 4. Lay out of protective berm -- map 5. Sections of protective berm.
505 _a1. Introduction -- 2. Discussion -- 3. Conclusions -- 4. Drawings -- 5. Quantities estimate
650 4 _aEarth fill dam
_zCyprus
_zPaphos
_zMavrokolymbos
_9166070
650 4 _aΧωμάτινο φράγμα
_zΚύπρος
_zΠάφος
_zΜαυροκόλυμπος
_9166071
650 0 _aDams
_zCyprus
_9131101
_xDesign and construction
650 0 _aΦράγματα
_zΚύπρος
_9141070
_xΣχεδιασμός και κατασκευή
710 1 _4pbl
_9162456
_aΚύπρος.
_bΥπουργείο Γεωργίας, Αγροτικής Ανάπτυξης και Περιβάλλοντος.
_bΤμήμα Αναπτύξεως Υδάτων
942 _2ddc
_cREP
_h628.83095693
999 _c94049
_d94049