Kouris dam : valve chamber equipment : technical description, operating and maintenance instructions for water control equipment /
Kouris Dam = Φράγμα Κούρη
Metalna.
- Yugoslavia : Metalna, 1986.
- 313 p. : 51 maps ; 31 cm. Book II (84 p. ) : ill ; 31 cm.
Also available in digital form. 51 maps are included. Map 1. Lay-out of electrical equipment -- map 2. Butterfly valves 800 -- map 3. Hydraulic pumping unit with pipe lining -- map 4. Pumping unit -- map 5. Embedded parts -- map 6. Servomotors with bases and indicators -- map 7. Servomotor -- map 8. Base for servomotor -- map 9. Mechanical indicator -- map 10. Hydraulic Pumping unit with pipe lining -- map 11. Intake tower valve chamber - roller gates pumping unit 1rd drawing -- map 12. Intake tower valve chamber - roller gates pumping unit 2nd drawing -- map 13. Hydraulic diagram -- map 14. By pass pipe on Penstock -- map 15. Method of incorporation of overspeed detector -- map 16. Penstocks pad flanges for overspeeds detectors -- map 17. Penstocks pad flanges for overspeeds detector arrangement -- map 18. Penstocks overspeed detectors -- map 19. Hydraulic pump unit -- map 20. Cabling diagram -- map 21. Main power supply -- map 22. Main circuit diagram -- map 23. Control circuit diagram -- map 24. Electro magnetic solenoid valves -- map 25. Control voltage -- map 26. Butterfly valve 1 -- map 27. Butterfly valve 2 -- map 28. Pressure switch -- map 29. Differential pressure switch -- map 30. Fault contacts -- map 31. Signaling -- map 32. Signaling of butterfly valve 1 -- Signaling of butterfly valve 2 -- map 33. Signaling of faults -- map 34. Remote Signaling -- map 35. Control board VC+CB5 -- map 36. Layout of electrical equipment -- map 37. Single-pole diagram -- map 38. Main circuit diagram -- map 39. Control circuit diagram -- map 40. Electro magnetic solenoid valves -- map 41. Signaling of faults -- map 42. Local control -- map 43. Signaling of end position -- map 44. Filling position -- map 45. Leakage of compensation -- map 46. Local control -- map 47. Signaling of end position -- map 48. Leakage oil compensation -- map 49. Layout of electrical equipment -- map 50. Control board -- map 51. Remote signaling. Book II.
Earth fill dam--Cyprus--Limassol--Kouris Χωμάτινο φράγμα--Κύπρος--Λεμεσός--Κούρης Dams--Design and construction--Cyprus Φράγματα--Σχεδιασμός και κατασκευή--Κύπρος Valves--Design and construction