Στοιχεία MARC
000 -LEADER |
fixed length control field |
03939nam a22003377a 4500 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
CY-NiWDL |
005 - DATE AND TIME OF LATEST TRANSACTION |
control field |
20221025062702.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
220324s1966 cy b|||| ||||l00| 0 eng d |
040 ## - CATALOGING SOURCE |
Original cataloging agency |
CY-NiWDL |
Transcribing agency |
CY-NiWDL |
041 0# - LANGUAGE CODE |
Language code of text/sound track or separate title |
eng |
082 7# - DEWEY DECIMAL CLASSIFICATION NUMBER |
Classification number |
627.83095693 |
Edition number |
23 |
084 ## - OTHER CLASSIFICATION NUMBER |
Classification number |
YDP-D-Y-DES7 |
110 2# - MAIN ENTRY--CORPORATE NAME |
Relator code |
Author |
9 (RLIN) |
164133 |
Corporate name or jurisdiction name as entry element |
Energoprojekt Engineering & Consulting |
240 1# - UNIFORM TITLE |
Uniform title |
Yermasoyia Dam Project = Έργο Φράγματος Γερμασόγειας |
245 10 - TITLE STATEMENT |
Title |
Yermasoyia dam project : |
Remainder of title |
part project : spillway / |
Statement of responsibility, etc. |
Energoprojekt. |
246 13 - VARYING FORM OF TITLE |
Title proper/short title |
Yermasoyia Dam = Φράγμα Γερμασόγειας |
260 ## - PUBLICATION, DISTRIBUTION, ETC. |
Place of publication, distribution, etc. |
Nicosia : |
Name of publisher, distributor, etc. |
Department of Water Development, |
Date of publication, distribution, etc. |
1966. |
300 ## - PHYSICAL DESCRIPTION |
Extent |
v. I (114 p.) : |
Other physical details |
23 maps ; |
Dimensions |
30 cm. |
300 ## - PHYSICAL DESCRIPTION |
Extent |
v. II (3 p.) : |
Other physical details |
17 maps ; |
Dimensions |
30 cm. |
500 ## - GENERAL NOTE |
General note |
V. I includes 23 maps. <br/>Map 1. Spillway structure (according to first design) plan, sections and details -- map 2. Approach channel to spillway variant I -- map 3. Approach channel to spillway variant II -- map 4. Approach channel to spillway variant III -- map 5. Approach channel to spillway variant IV -- map 6. Velocities of approach in FT/sec parallel to the axis of dam -- map 7. Spillway structure (recommended variant) -- map 8. Detail of spillway structure -- map 9. Spillway discharge curves -- map 10. Location of measuring points on spillway crest and face for water surface profiles -- map 11. Piezometer locations on spillway crest and face, on guide walls and piers, along chute, and on trajectory bucket -- map 12. Water surface profiles and pressures on crest, along spillway face and on guide wall in I spillway opening -- map 13. Water surface profiles and pressures on crest, along spillway face and on guide wall in II spillway opening-- map 14. Water surface profiles and pressures on crest, along spillway face and on guide wall in III spillway opening -- map 15. Water surface profiles and pressures on crest, along spillway face and on guide wall in IV spillway opening -- map 16. Pressures on spillway with tainter gates at elevation 270.67' upstream level 284.00' -- map 17. Pressures on spillway with tainter gates at elevation 274.50' upstream level 288.00' -- map 18. Trajectory bucket variants at end of chute spillway -- map 19. Chute spillway water surface profiles and maximum jet-trajectory lenght for variants I-IV -- map 20. Chute spillway water surface profiles at a discharge of 30 000cfs and jet - trajectory lenght for various discharge all gates raised -- map 21. Pressures on chute spillway all gates raised -- map 22. Layout -- map 23. Sections 3-3, 4-4, 5-5. |
500 ## - GENERAL NOTE |
General note |
V. II includes 17 maps. <br/>Map 1. Survey elements -- map 2. Layout drainage sistem -- map 3. Sections 0, 1, 2 -- map 4. Sections 6-6, 7-7, 8-8, 9-9, 10-10 -- map 5. Sections 10.6 , 11 and plan -- map 6. Details A, B, C, D, E, F -- map 7. Layout detail G, H, I -- map 8. Estimate the tail water level -- map 9. Bridge over spillway shuttering plan -- map 10. Anchors for piers on overflow crest oeinforcement plan -- map 11. Concrete lining reinforcement plan -- map 12. Concrete lining reinforcement plan of joints -- map 13. Walls on left side of overflow reinforcement plan -- map 14. Flip bucket reinforcement plan. |
500 ## - GENERAL NOTE |
General note |
Also available in digital form. |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
Topical term or geographic name entry element |
Earth fill dam |
Geographic subdivision |
Cyprus |
-- |
Limassol |
-- |
Yermasoyia |
9 (RLIN) |
163836 |
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM |
Topical term or geographic name entry element |
Χωμάτινο φράγμα |
Geographic subdivision |
Κύπρος |
-- |
Λεμεσός |
-- |
Γερμασόγεια |
9 (RLIN) |
163838 |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
Topical term or geographic name entry element |
Φράγματα |
Geographic subdivision |
Κύπρος |
General subdivision |
Σχεδιασμός και κατασκευή |
9 (RLIN) |
141070 |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
Topical term or geographic name entry element |
Dams |
Geographic subdivision |
Cyprus |
General subdivision |
Design and construction |
9 (RLIN) |
131101 |
653 ## - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Spillway |
653 ## - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Υπερχειλιστής |
710 1# - ADDED ENTRY--CORPORATE NAME |
Relator code |
Publisher |
Corporate name or jurisdiction name as entry element |
Κύπρος. |
Subordinate unit |
Υπουργείο Γεωργίας, Αγροτικής Ανάπτυξης και Περιβάλλοντος. |
-- |
Τμήμα Αναπτύξεως Υδάτων |
9 (RLIN) |
162456 |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
Dewey Decimal Classification |
Koha item type |
Books |
Classification part |
627.83095693 |